1. Information Driven Manufacturing:
MIS for Maintenance warehouse, Industrial project, 2006, 300K (PI)
Information Platform for modern Distribution, Beijing municipal government, 2005-2006, 1.5M (PI)
Information System for railway Marshall Scheduling, MOR project, 2005-2006, 200K (PI)
Product and Process Data Management System, Industrial project, 2003-2004, 150K (PI)
Web based collaborative process planning and Manufacturing date management, National High Technology program, 2002-2004, 400K (PI)
Software design and evaluation for ATM, Industrial project, 2002-2003,270K (PI)
Manufacturing Executing System for QingChuang Company, Industrial project, 2001-2002, 250K (PI)
Virtual Product Developing System: Virtual Machine tools, Industrial Project, 1999-2001, 2.6M (PI)
Network based agile Manufacturing, 985 MOE project, 1998-2001.2, 11.5M (PI)
Enabling Technology for Agile Manufacturing system, NSFC key project, 1997-2000, 1.0M (PI)
Technology Enabling Agile Manufacturing, 863 High tech program, 1997-1998, 300K (PI)
2. Production System Engineering:
WIP reduction for CPU factory, Intel-shanghai, 2006, US$20K (PI)
Production Modeling & Scheduling, Intel-shanghai, 2005, US$20K (PI)
Intelligent Scheduling by using Reinforce learning algorithm , National Scicence Foundation of China, 2004-2006, 260K (PI)
Advanced Planning/Scheduling in Assembly/Test Manufacturing, Intel-shanghai, 2004, US$30K (PI)
Design and optimization of logistics system for effective distribution, Beijing municipal government, 2002-2003, 1.0M (PI)
Advanced Manufacturing System: Design and Optimizaton, National Technology improvement program, 2002-2003, 800K (PI)
Reverse logistics: model and simulation, Ph. D foundation, 2002-2004, 40K (PI)
Simulation Based Analysis for Automobile Production System, MoE Project, 1998-2001, 3.0M (PI)
3. Advanced Manufacturing Technology:
Packing Optimization, Caterpillar, 2005, US$10K (PI)
Cutting force prediction and machining process optimization, Rolls-Royce Corp., 2002-2003,US$14K (PI)
Research on Manufacturing Process of Ring Gauge, Industrial project, 2001-2003, 200K (PI)
Virtual Design for helmet, Industrial Project, 2000-2002, 600K (PI)
Accuracy Compensation for heat extension in a Machining Center, Industrial project, 2000-2001, 200K (PI)
Virtual Cutting: Model Based Simulation, NCFC, 1998-2000, 150K (PI)
Cutting tool Monitoring for Turning Center, MOM project, 1991-1995 (Co-PI)
Monitoring the Turning Process, MOM project, 1986-1990 (PI: Prof. BP Zhang)